Piling Work with Zero Clearance to Existing Adjacent Structures

The Zero Clearance Method enables piles to be installed in sites where piling right up against adjacent structures and
boundaries is required to make maximum use of land. This method is effective for the total utilisation of available land for
building construction works and canal renovation works in areas where conventional construction equipment can not gain
access.

Ultimate Zero Clearance

Sheet piling with zero clearance to adjacent structures is a revolution in construction methods. Piles can be pressed-in
silently and accurately by hydraulically controlled manoeuvre creating zero dead space between piles and existing
structures. The Zero Clearance Method demonstrates the highest level of safety and effectiveness of the Press-in Method.

 